Supply and installation of all types and sizes of connecting pipes (P.V.C, ductile iron, and others) at the required levels.
Placing locks of all sizes according to the specified distances and measurements, including draw-off locks for large supply pipes, and the necessary work to create main openings at specified distances and measurements.
We have all the necessary equipment for digging, inserting, and placing tools under and around the pipes and pathways.
Preliminary and final tests of the networks and installation of the required water pressure heads.